Product Details:
Minimum Order Quantity | 1 Piece |
Block Type | Paver |
Capacity | 2000-2500 Blocks per hour |
Usage/Application | Construction |
Method | Vibration |
Automation Grade | Fully Automatic |
Material | Concrete |
Model Name/Number | CBM 10V |
Warranty | 1 Year |
Brand | ANECO |
Shed for Machine Setup | 100 x 50 ft |
Production Rate | 2400 paver per hour |
Country of Origin | Made in India |
Aneco 10V |
Pallet Size: 700 x 550 mm |
|
|
|||
Product |
Size |
Face Mix |
Stroke / Min |
Pcs / Stroke |
Production / Hr |
Rated Production /8Hrs. |
Brick |
230 x 110 x 75
|
|
4 |
10 |
2400 |
19200 |
Brick (W/o Frog) |
230 x 110 x 75
|
4 |
14 |
3360 |
26880 |
|
I Shape Paver Block |
200 x 100 x 60 |
Without |
4 |
10 |
2400 |
19200 |
I Shape Paver Block |
200 x 100 x 60
|
With |
3 |
10 |
1800 |
14400 |
Concret Block / Hollow Block |
400 x 200 x 200 |
3 |
3 |
540 |
4320 |
|
Block |
300 x 200 x 150 |
3 |
4 |
720 |
5760 |
|
Block |
300 x 200 x 100 |
3 |
6 |
1080 |
8640 |
Note:
Additional Information:
Product Details:
Minimum Order Quantity | 1 Set |
Capacity | 1500-2000 bricks per hour |
Automation Grade | Automatic |
Brick Type | Solid |
Brand | ANECO |
Tolerance | 1 mm |
Model Name/Number | CBM 8V |
Method | Hydraulic Pressure |
Warranty | 1 Year |
System | Hydraulic |
Material | Mild Steel |
PRODUCT SIZE & PRODUCTION DETAILS
CBM 8V |
Pallet Size: 600 x 600 x 25 mm |
|||||
Product |
Size* |
Face Mix |
Stroke / Min |
Pcs / Stroke |
Production / Hr** |
Rated Production /8Hrs.** |
Brick |
230 x 110 x 75
|
|
4 |
8 |
1920 |
15360 |
Brick (W/o Frog) |
230 x 110 x 75
|
4 |
12 |
2880 |
23040 |
|
I Shape Paver Block |
200 x 100 x 60 |
Without |
4 |
8 |
1920 |
15360 |
I Shape Paver Block |
200 x 100 x 60
|
With |
2.5 |
8 |
1200 |
9600 |
Uni Paver |
225 X 112.5 X 60/80
|
Without |
4 |
8 |
1920 |
15360 |
Uni Paver |
225 X 112.5 X 60/80
|
With |
2.5 |
8 |
1200 |
9600 |
Concret Block / Hollow Block |
400 x 200 x 200 |
3 |
2 |
360 |
2880 |
|
Block |
300 x 150 x 200 |
3 |
3 |
540 |
4320 |
* Dimensions and Tolerances may differ as per IS Code: 15658:2006
**Production Capacity mentioned is a rated capacity and it depends upon experience of work force, Efficient Team & Production effective time management.
** PLF @ 75-80% (Consider Actual Production: 75-80 % of Rated Capacity)
Additional Information: